OTHER PROJECTS – PMU/PPU/SUBSTATIONS

Project Management Services For 275KV Transmission Lines And Substations

Duration: Dec 1993 – Dec 1995
Client: Segari Energy Venture (SEV)
Scope: The scope of services was for Project Management for the Segari Energy Venture 275 kV transmission lines project from SEV Power Station in Lumut to Batu Gajah and 275 kV substations at SEV Power Plant, Air Tawar, and Batu Gajah. Sabah Project.

KLIA Consultancy Services For Package 9 Stage 1

Duration: Apr 1994 – Apr 1995
Client: Kuala Lumpur International Airport Berhad (KLIAB)
Scope: Provision of consultancy services for package 9 (33kV and 11kV distribution network including SCADA). The scope of work includes detailed design, preparation of tender drawings and documents tender evaluation, and tender recommendation reporting to the client.

Electrical Supply System For TNRD’s Testiac Project

Duration: Feb 1994 – May 1995
Client: TNB Research & Development (TNR D)
Scope: EPC’s contract to design, erect and commission the electrical power supply system required for a thermal ice storage project at the Port Dickson Power Station.

KLCC & Danau Desa GIS Substation – Civil & Electrical Package

Duration: 1995 – 1996
Client: Hyusong Industry Co Ltd (HICO)
Scope: The scope of work involved the construction of a 132 kV GIS substation and the supply and erection of 33 kV and 11 kV switchgear for KLCC and Danau Desa GIS substations. The project was completed in mid-1996.

500kV Substations – MV/LV Supply

Duration: Oct 1996 – Dec 1997
Client: MRCB / PNB
Scope: TNEC was awarded the sub-contract Package ST by MRCB/ PNB Consortium to provide turnkey works for the AC Auxiliary Supply to the 500 / 275 kV substations in Junjung, Gurun, Yong Peng (N), and Bukit Batu.

Supply & Erect Of Transmission In TNB System

Duration:
(1) Skudai 132/33 Extension Substation (July 2000)
(2) Kampar 132/33 11kv Substation (July 2000)
(3) Telok Kalong 275kv Substation (July 2000)
(4) Bukit Tengah 132/33kv Extension Substation (Sept 2000)
(5) Pmu 132kv Skudai (Rehab) (Mac 2003
(6) Pmu 275/132kv Bukit Batu Extension (November 2001)
Client: Tenaga Nasional Berhad
Scope: The scope of works covers procurement, supply, delivery, erection, installation, testing, commissioning, and maintenance.

Supply & Erect Of Transmission In TNB System

Duration:
(1) PMU Pasir Gudang 132/ 22kV Substation Extension (June 2000 – Feb 2002)
(2) PMU Tampoi132/22kV Extension (June 2001- January 2002)
(3) PMU Skudai 132/33kV Substation Extension (From June 2000)
(4) PMU Chuping 275kV/132kV Substation Extension (June 2000 – April)
(5) PMU Telok Kalong 275 kV Substation Extension (From June 2000)
(6) PMU Bukit Batu 275/132kV Substation Extension (From June 2000)
(7) PMU Mentakab 132/11kV Extension (From June 2000)
(8) 132kV GIS Extension for Gelugor Substation (From February 2002)
(9) 132kV GIS Extension for Sg. Pinang (From February 2002)
Client: Tenaga Nasional Berhad
Scope: The scope of work involved supply, delivery, installation, testing, commissioning, and maintenance for 12 calendar months from the date of commissioning of Transmission Substation in TNB System.

Remote End Relays Upgrade At Kota Setar & Kuala Perlis Substation (275kV & 132 kV)

Duration: To complete in June 2002
Client: Teknologi Tenaga Perlis Consortium   
Scope: The scope of work involved design, supply, installation, testing, and commissioning of the protection and control equipment of 275kV Chuping Feeder I at Kota Setar substation and 132kV Kota Setar – Kuala Perlis Feeders I and II at both ends.

Pergau Power Station Transformer (Stage 2)  275kV/33kV/11kV Temporary Supplies

Duration:  From April 2002
Client: Tenaga Nasional Berhad
Scope: The scope of work involved EPC Contract for engineering, procurement and commissioning of the proposed 11kV and 33kV supplies to Pergau Power Station for Stage 2.

Pergau Power Station – Proposed 11kV & 33kV Temporary Supply (Stage 1)

Duration: December 2001 – Jan 2002
Client: Tenaga Nasional Berhad
Scope: The scope of work involved EPC Contract for engineering, procurement, and commissioning of the proposed 11 kV and 33kV supplies to Pergau Power Station and Terang Pumping Station respectively.

Pergau Power Station – Semi-Permanent 275/33/11kV Station Supply (Phase 2)

Duration: July 2002
Client: TNB Hidro Sdn Bhd
Scope: The scope of works consists of the temporary installation of the 275/ 11kV 68MVA Transformer and its associated work and is also inclusive of bridge strengthening, 1SMVA, 33/11kV transformer oil removal, and filling up with nitrogen gas as well as transportation to site.

TTPC – Kota Setar 275kV & 132kV TTPC Relay & Current Transformer Upgrade For Kota Setar/Kuala Perlis Feeder 1 & 2 And Kota Setar/Chuping 275kV

Duration: April 2002
Client: TIPC
Scope: The scope of works cover the procurement, supply, delivery, erection, installation, testing, commissioning and maintenance.

Proposed 275/132kV Line Termination At Bukit Rajah GIS Substation: (1) 132kV Transmission Line CBPS To Bukit Rajah GIS (2) 132kV Transmission Line CBPS To Bukit Rajah & Port Klang To Bukit Rajah GIS

Duration: Feb 2003 – Nov 2003
Client: Tenaga Nasional Berhad
Scope: The scope of works includes supply, erect, string, test, and commissioning of these lines:

  • 132kV transmission line CBPS to Bukit Rajah GIS

  • 275kV transmission line CBPS to Bukit Rajah GIS and Port Klang to Bukit Rajah GIS

  • 132kV transmission line MERU to Bukit Rajah GIS and SHAN to Bukit Rajah GIS

Project – Projek Rangkaian Pembahagian SESB Di Bawah RMK-8

Duration: May 2003
Client: SESB
Scope: 

  • Construction on a new 33/11 kV PPU, Limbawang, Beaufort
  • Construction on a new 33/11 kV PPU, Ranca-Ranca, Labuan
  • Construction on a new 33/11 kV PPU, Sandakan
  • Construction on a new 33kV Ring System for Tawau airport from Kalimpang, Tawau.
  • Supply, Install, Cabling Works, Test, and Commission at PMU Lahad Datu.
  • Timatch-Sabah Parks 11kV ABC Cabling Works
    132/33/11kV Sungai Besar & Kuala Selangor Extension

    Duration: May 2003
    Client: Tenaga Nasional Berhad
    Scope: The scope of works include design, manufacture, testing, supply, delivery, installation, com­ mission and maintenance for a period of twelve (12) calendar months from the date of commissioning of 132kV, 33kV & 11kV Switchgears and related civil works for PMU Sungai Besar and Kuala Selangor Extensions. 

    132/11kV Bukit Rambai & Nilai No. 3-2X 1SMVA Transformer Bays

    Duration: Marc 2003 – Dec 2003
    Client: Tenaga Nasional Berhad
    Scope: The scope of works include supply, install, test and commission transformer feeder for transformer 132/11kV MVA at Bukit Rambai Substation and Nilai No.3 Substation.

    Grik 275kV/11kV Rehabilitation

    Duration: Apr 2003 – Jul 2003
    Client: Tenaga Nasional Berhad
    Scope: The contract is fast-track in nature and is to be completed on an urgent basis. The scope of works requires TNEC to transfer a 75 MVA transformer, 275 kV current transformer, and two (2) 32.5 MVA reactors from PMU Temenggor to PMU Grik. The substation was successfully commissioned on 25 June 2003.