OTHER PROJECTS

FEASIBILITY STUDY FOR SABAH IPP

Duration : Aug 1993 – Dec 1993                        

Client : EPE Power                   

Scope : TNEC undertook a feasibility study for EPE Power to determine both the financial and technical viability of the proposed IPP Sabah Project.

KUALA LANGAT POWER PLANT

Duration : Sep 1993 – Feb 1993                       

Client : Genting Sanyen Power Sdn Bhd                   

Scope : The scope of services was the provision of project management specialists to advice the client on the technical and commercial aspects of the turnkey project. The total plant capacity was 720 MW with a total turnkey contract value of RM1.5 billion.

PROJECT MANAGEMENT SERVICES FOR 275 KV TRANSMISSION LINES AND SUBSTATIONS

Duration : Dec 1993 - Dec 1995                     

Client : Segari Energy Venture (SEV)                   

Scope : The scope of services was for Project Management for the Segari Energy Venture 275 kV transmission lines project from SEV Power Station in Lumut to Batu Gajah and 275 kV substations at SEV Power Plant, Air Tawar and Batu Gajah.

KLIA CONSULTANCY SERVICES FOR PACKAGE 9 STAGE 1

Duration : Apr 1994 - Apr 1995                   

Client : Kuala Lumpur International Airport Berhad (KLIAB)                   

Scope : Provision of consultancy services for package 9 (33kV and 11kV distribution network including SCADA). The scope of work includes detailed design, preparation of tender drawings and documents tender evaluation and tender recommendation reporting to client.

ELECTRICAL SUPPLY SYSTEMS FOR TNRD'S TESTIAC PROJECT

Duration : Feb 1994 - May 1994                    

Client : TNB Research & Development (TNR D)                  

Scope : EPC's contract to design, erect and commission the electrical power supply system required for a thermal ice storage project at the Port Dickson Power Station.

1 / 8

Please reload

TNB Engineering Corporation Sdn Bhd @ 2019 | Terms & Conditions | Staff Webmail