OTHER PROJECTS

Feasibility Study For Installation Of Street Lighting Along North – South Highway

Duration: 2 months (early 1997)
Client: Pengurusan Lebuhraya Berhad (PLB)
Scope: TNEC undertook a feasibility study to determine and identify the technical & commercial requirements for the installation of street lighting along the North – South Expressway (NSE).

Development of Data Warehouse For TNB Transmission Network

Duration: Jul 1997 – Nov 1998
Client: Tenaga Nasional Berhad
Scope: A part of a 12-year program to implement and utilize microprocessor­ based technology for local control, protection, recorders, databank, time reference, etc. The 1st phase of the project was intended to utilize the substation control system and databank for a selected few grid substations as a “proof-of-concept” effort.

Relocation Of TNB’s 275kV Overhead Transmission Line Tower & Underground Cable Due To Upgrading Road Works From Alor Gajah To Bandar Melaka

Duration: From July 2002
Client:Tenaga Nasional Berhad
Scope: The scope of work involved design, supply, install, test, and commission of TNB’s 275kV and 132kV Overhead Transmission Line, Tower, and Underground Cable Diversion works due to upgrading road works from Alor Gajah to Bandar Melaka.

Pusat Latihan Gabungan, Pasukan Tempur Tentera Darat, Fasa Di Gemas, N.Sembilan – 11kV Electrical Infrastructure Works

Duration: June 2003
Client: THUB & Kementerian Pertahanan Malaysia
Scope: The scope of work encompasses 11kV Infrastructure Works for a military base in Gemas, Negeri Sembilan under the Ministry of Defense (MINDEF). Works include 11kV cable laying and installation of transformer and ring main unit.

Digital Simulator System

Duration: August 2003
Client: Tenaga Nasional Berhad
Scope: The scope of work encompasses the supply of equipment, fabrication, and engineering work to develop a digital simulator system to train substation operators on SCS systems (Substation  Control  System)

Relocation Of Transformer 60 MVA And 30 MVA Inclusive Of Termination Works From Transmission & Switchgear

Duration: August 2003
Client: TNB Transmission lpoh, Perak  
Scope: Relocation of Transformer 60 MVA and 30 MVA inclusive of termination works from transmission & switchgear.

Relocating OG TNB’s 132kV Underground Cable Due To Upgrading Road Works At Jalan Muar – Melaka – Alor Gajah – Simpang Empat

Duration: Apr 2003 – Aug 2003
Client: Tenaga Nasional Berhad
Scope: The scope of works includes supply, erect, string, test, and commissioning of these lines:

  • 132kV transmission line in Kg. Ayer Udang
  • 132kV transmission line in Taman Seri Bayu
  • 275/132kV transmission line in Kg. Paya Datuk