OTHER PROJECTS

PMU / PPU / SUBSTATION

PROJECT MANAGEMENT SERVICES FOR 275 KV TRANSMISSION LINES AND SUBSTATIONS

Duration : Dec 1993 - Dec 1995                     

Client : Segari Energy Venture (SEV)                   

Scope : The scope of services was for Project Management for the Segari Energy Venture 275 kV transmission lines project from SEV Power Station in Lumut to Batu Gajah and 275 kV substations at SEV Power Plant, Air Tawar and Batu Gajah.

KLIA CONSULTANCY SERVICES FOR PACKAGE 9 STAGE 1

Duration : Apr 1994 - Apr 1995                   

Client : Kuala Lumpur International Airport Berhad (KLIAB)                   

Scope : Provision of consultancy services for package 9 (33kV and 11kV distribution network including SCADA). The scope of work includes detailed design, preparation of tender drawings and documents tender evaluation and tender recommendation reporting to client.

ELECTRICAL SUPPLY SYSTEMS FOR TNRD'S TESTIAC PROJECT

Duration : Feb 1994 - May 1994                    

Client : TNB Research & Development (TNR D)                  

Scope : EPC's contract to design, erect and commission the electrical power supply system required for a thermal ice storage project at the Port Dickson Power Station.

KLCC & DANAU DESA GIS SUBSTATION - CIVIL & ELECTRICAL PACKAGE

Duration : 1995 - 1996                    

Client : Hyusong Industry Co Ltd (HICO)               

Scope : The scope of work involved the construction of 132 kV GIS substation and the supply and erection of 33 kV and 11 kV switchgears for KLCC and Danau Desa GIS substations. The project was completed in mid-1996.

500 kV SUBSTATIONS - MV/ LV SUPPLY

Duration : Oct 1996 - Dec 1997

Client : MRCB / PNB                 

Scope : TNEC was awarded the sub-contract Package ST by MRCB/ PNB Consortium to provide turnkey works for the AC Auxiliary Supply to the 500 / 275 kV substations in Junjung, Gurun, Yong Peng (N) and Bukit Batu.

SUPPLY AND ERECT OF TRANSMISSION IN TNB SYSTEM

Duration : 

(1) Skudai 132/33 Extension Substation (July 2000)

(2), Kampar 132/33 11kv Substation (July 2000)

(3), Telok Kalong 275kv Substation (July 2000)

(4), Bukit Tengah 132/33kv Extension Substation (Sept 2000)

(5), Pmu 132kv Skudai (Rehab) (Mac 2003)

(6), Pmu 275/132kv Bukit Batu Extension (November 2001)

Client : Tenaga Nasional Berhad              

Scope : The scope of works covers the procurement, supply, delivery, erection, installation, testing, commissioning and maintenance.

SUPPLY AND ERECT OF TRANSMISSION IN TNB SYSTEM

Duration :   (1) PMU Pasir Gudang 132/ 22kV Substation Extension (June 2000 - Feb 2002)

(2) PMU Tampoi132/22kV Extension (June 2001- January 2002)

(3) PMU Skudai 132/33kV Substation Extension (From June 2000)

(4) PMU Chuping 275kV/132kV Substation Extension (June 2000 - April)

(5) PMU Telok Kalong 275 kV Substation Extension (From June 2000)

(6) PMU Bukit Batu 275/132kV Substation Extension (From June 2000)

(7) PMU Mentakab 132/11kV Extension (From June 2000)

(8) 132kV GIS Extension for Gelugor Substation (From February 2002)

(9) 132kV GIS Extension for Sg. Pinang (From February 2002)

Client : Tenaga Nasional Berhad              

Scope : The scope of work involved supply, delivery, installation, testing, commissioning and maintenance for 12 calendar months from the date of commissioning of Transmission Substation in TNB System.

REMOTE END RELAYS UPGRADE AT KOTA SETAR & KUALA PERLIS SUBSTATION (275KV & 132KV)

Duration : To complete in June 2002

Client : Teknologi Tenaga Perlis Consortium             

Scope : The scope of work involved design, supply, installation, testing and commissioning of the protection and control equipment of 275kV Chuping Feeder I at Kota Setar substation and 132kV Kota Setar – Kuala Perlis Feeders I and II at both ends.

PERGAU POWER STATION TRANSFORMER (STAGE 2) - 275KV/33KV/11KV TEMPORARY SUPPLIES

Duration : From April 2002

Client : Tenaga Nasional Berhad              

Scope : The scope of work involved EPC Contract for engineering, procurement and commissioning of the proposed 11kV and 33kV supplies to Pergau Power Station for Stage 2.