POWER PLANT

FEASIBILITY STUDY FOR SABAH IPP

Duration : Aug 1993 – Dec 1993                        

Client : EPE Power                   

Scope : TNEC undertook a feasibility study for EPE Power to determine both the financial and technical viability of the proposed IPP Sabah Project.

KUALA LANGAT POWER PLANT

Duration : Sep 1993 – Feb 1993                       

Client : Genting Sanyen Power Sdn Bhd                   

Scope : The scope of services was the provision of project management specialists to advice the client on the technical and commercial aspects of the turnkey project. The total plant capacity was 720 MW with a total turnkey contract value of RM1.5 billion.

PAKA & PASIR GUDANG COMBINED CYCLE

Duration : June 1994 – June 1996                    

Client : Tenaga Nasional Berhad                

Scope : The scope of work involved the procurement, erection and commissioning of the balance of plant works specifically in the area of plant mechanical and electrical. The plant size was 243 MW respectively.

KAPAR POWER STATION (PHASE III)

Client : Tenaga Nasional Berhad                 

Scope : The scope of work covers the procurement, erection, commissioning and supervision of the various plant electrical and mechanical auxiliaries, of 2 x 500 MW capacity.

MELAKA COMBINED CYCLE CONVERSION

Duration : Jan 1995 – Nov 1997

Client : Tenaga Nasional Berhad                 

Scope : This is a turnkey contract undertaken by TNEC in a joint venture with local and international partners. The project involved the Conversion of 2 GE Frame 9 Machines into Combined Cycle operations, of 120 MW capacity.

RELOCATION OF GAS TURBINE FROM PASIR GUDANG TO GELUGOR

Duration : Feb 1995 – Nov 1995

Client : Tenaga Nasional Berhad                 

Scope : The scope of work involved the dismantling of one GE Frame 9 (110 MW) at Pasir Gudang Power Station and the transportation to Gelugor Station, reinstallation and commissioning of the gas turbine. The scope also involved the redesign and construction of the electrical switchgears at Gelugor Power Station.

RELOCATION OF 2 X 30 MW GAS TURBINE FROM KAPAR TO PULAU LANGKAWI

Duration : 5.5 months

Client : Tenaga Nasional Berhad                 

Scope : The scope of work involved the dismantling of 2 x 30 MW GEC Alsthom GTs at Kapar and the transportation to the Teluk Ewa Power Station in Langkawi, reinstallation and commissioning of the Gas Turbines. The scope also involved the redesign and construction of the electrical switchgear at Teluk Ewa Power Station in Langkawi.