Location                   Contract Delivery    

Method                    

Project Size            

Construction            

Period    

:

:

 

:

:

Bangsar, Malaysia 

Build, Own and Operate (BOO)

           

11,336 RT            

1997 - 1998

Parameters of the plant are as follows:

Cooling Load Maximum Demand                 

Daily Energy Usage                                      

Energy Storage                                             

Peak Supply from Brine Chiller/Storage        

Peak Supply from Base (Water) Chillers       

Storage Volume                                             

Distribution Temperature at plant outlet        

5 centrifugal brine chillers                             

(capacity & temperatures)                            

2 base centrifugal water chillers                    

(capacity & temperatures)

Length of reticulation piping networks          

9,800 RT

127,257 RTh

30,650 RTh

7,680 RT

2,120 RT

1,900 cubic meters

5°C

1,036 RT @ 3.3/8.6°C

588 RT @ -5/-2°C

1,060 RT @ 5/14.5°C

Approx. 1.75 km

1/3

PANTAI DCS PLANT, BANGSAR