SOLAR - EPCC

TNEC has successfully completed the EPCC of 3 Large Scale Solar Photovoltaic (LSSPV) plants with a total capacity of 109MWac (50MWac TNB Solar Sepang, 29MWac Leader Solar Energy & 30MWac TNB Bukit Selambau). The TNB Solar Sepang plant is design and capable to generate 78MWdc and currently is the largest LSSPV in the country.

PROJECT HIGHLIGHT

50MWAC LARGE SCALE SOLAR PHOTOVOLTAIC PLANT

Client

Location                  

Project Type               

Area Covered

Project Size              

:

:

:

:

:

TNB Sepang Solar

Kuala Langat, Malaysia

EPCC & O&M

243 acres

50MWac

This Large Scale Solar (LSS) is the TNEC's first solar project that commences its full operation in November 2018 and become the country's largest solar farm. It is generating and transmitting 50MW of electricity to the national grid. TNEC was the EPCC contractor and currently is carrying out the O&M for this solar farm.

1/1

29MWAC LARGE SCALE SOLAR PHOTOVOLTAIC PLANT

Client

Location                  

Project Type               

Area Covered

Project Size              

:

:

:

:

:

Leader Solar Energy

Kuala Muda, Malaysia

EPCC

106 acres

29MWac

This Large Scale Solar Photovoltaic (LSSPV) project is a 29MWac photovoltaic power generating facility developed by Leader Solar Energy Sdn Bhd with TNEC-ERS JV as Engineering, Procurement, Construction and Commissioning (EPCC) contractor. The project which commenced in September 2017 is located in Kuala Muda, Kedah and was completed in November 2018.

1/1

30MWAC LARGE SCALE SOLAR PHOTOVOLTAIC PLANT

TNB Bukit Selambau Solar

Bukit Selambau, Kedah

EPCC

124 acres

30MWac

Client

Location                  

Project Type               

Area Covered

Project Size              

:

:

:

:

:

This 30MWac Large Scale Solar Photovoltaic (LSSPV) has successfully commenced operation in Bukit Selambau, Kedah (LSS Bukit Selambau) on 8th September 2020. The plant has started its early operations 114 days ahead of schedule from the initial target on December 31, 2020.TNEC also in charge of Operation & Maintenance activities