Location: Sepang, Malaysia
Project Type: BOT (under a 20-year concession)
Project Size: 18,000 RT
Construction Period: Jan 2011 – Apr 2012
Location: Sepang, Malaysia
Project Type: BOT (under a 20-year concession)
Project Size: 18,000 RT
Construction Period: Jan 2011 – Apr 2012